After a brief consultation with Skip, our construction project manager, we decided to tackle the awning on the studio. This is a big job we’ve discussed several times before, and have almost hired out a couple times. This time it’s serious and we’re moving forward. We’re going to tear off the existing awning and replace it with a simpler, less structural awning, perhaps a translucent corrugated material to let in more light. So, that’s what’s next on the construction schedule. And it’s all Skip’s fault, too.